The whole idea in one line: the rota keeps the score, so none of you has to.
Any housemate can mark a job as not done. It takes two taps, and the second tap shows exactly what it costs. The job moves to whoever is freest, and the minutes are added to the skipper’s coming weeks — so the rota quietly evens it out instead of someone having to bring it up at dinner.
Because everything is counted in your own minutes. Everyone says what each chore costs them, and the planner balances those numbers, not the number of jobs. If you said the bathroom takes you 60 minutes and someone else said 25, you will get it less often and more small jobs instead. You can see everyone’s numbers on the Balance tab — that openness is what keeps it honest.
Twelve weeks. Future weeks are a preview: they shift if someone changes their availability, joins, leaves, or falls behind. The current week only changes when one of you does something.
Have a look at the privacy notice for what is stored about you, or the terms. Anything else, get in touch through the address at the bottom of this page.
Beurt · free for shared houses · info@onzebeurt.nl